Air Supply (Live) - Wide View
ARDI
|
Dashboard
|
Location
|
Search
Auto
5 Samples
10 Samples
30 Samples
50 Samples
100 Samples
200 Samples
400 Samples
1000 Samples
[ LOADING ]
Asset:
Asset:
Name:
Under:
Save Dashboard
Instrument Air System
Instrument Air Drier A
Instrument Air Drier B
Air Drier Mainline Filter
Coarse Coal Air Filter A
Coarse Coal Air Filter B
Instrument Air Isolation Valve for V1088, V1149, V1150, V1185, V1807
Instrument Air Isolation Secondary for Valves FV3-1A.1, FV3-1A.2, FV3-1C.1
Air Drier B Air Isolation Valve #1
Air Drier B Air Isolation Valve #2
Air Drier A Air Isolation Valve #1
Air Drier A Air Isolation Valve #2
Instrument Air Isolation Secondary for Valve FV3-2C.2
Instrument Air Isolation Secondary for Valve FV3-2C.1
Coarse Coal Air Filter Isolation Valve
Instrument Air Isolation B Side Splitter Tower for LCV3-20B.1, LCV3-8B.1 & FV3-19B.1
Instrument Air Isolation B Side Splitter Tower Isolation Ball Valve at T-Off
Instrument Air Isolation at T-Off to LCV4-27.1 Coal Thickener Sump Level
Instrument Air Isolation to Belt Press Filter A (BPFA) FL 4-50A
Instrument Air Isolation Miscellaneous at T-Off
Instrument Air Isolation Valve for V2848
Instrument Air Isolation Flotation Bank C Isolation Ball Valve at T-Off
Instrument Air Isolation Flotation Bank C Isolation Ball Valve Intermediate
Instrument Air Isolation Tailings Valves at T-Off
Instrument Air Isolation Thickening Cyclone Sample Control Valve 4-13.1 Intermediate Valve
Instrument Air Isolation Thickening Cyclone Sample Control Valve 4-13.1 at T-Off
Instrument Air Isolation Cationic FV4-56A.1 & FV4-56B.1 at T-Off
Instrument Air Isolation Tailings Oversize Screen SN4-34 at T-Off
Instrument Air Isolation Oversize Tailings Spiral and Screen Feed Control Valves C FV4-32.4 & FV4-32.5
Instrument Air Isolation for Slimes Tank Outflow and Underflow FV4-41A.1 & .2 FV4-41B.1 & .2
Plant Air Ring Main Isolation at Rotary Breaker Pit
Plant Air Ring Main Isolation to Lube Unit RB 1-6
Instrument Air Isolation Flotation Bank C at T-Off
Instrument Air Isolation Flotation Bank C Isolation Ball Valve Intermediate Valve
Instrument Air Isolation Clarified Water Isolation Addition Isolation Ball Valve to FV5-2.1
Coarse Coal Plant Air Ring Main Isolation Valve
Instrument Air Isolation Screen C Clarified Water Isolation Valve at T-Off
Instrument Air Isolation Tailings & BPFB Isolation Ball Valve at T-Off
Instrument Air Isolation Tailings & BPFB after T-Off Isolation Valve
Instrument Air Isolation BPF Feed Pump A Fresh Water Feed Valve FV4-52A.1
Instrument Air Isolation at T-Off for HBF Pumps A, B & C FV7-15 A.1, B.1 & C.1
Instrument Air Isolation Fire System Level Control Valve LCV8-30.1 on Main Line
Instrument Air Isolation Secondary Correct Medium Pump Contol Valves FV3-56.1, FV3-57C.1 & FV3-57C.2
Instrument Air Isolation Secondary Correct Medium Pump A Inlet and Drain Valves FV3-57A.1 & FV3-57A.2
Instrument Air Isolation Secondary Correct Medium Pump A Inlet Valve FV3-57A.1
Instrument Air isolation Tailings Thickener Underflow Flushing Valves at T-Off
Instrument Air Ring Main Isolation Valve
Air Drier Bypass Valve
Plant Air Ring Main Isolation Valve